Page 43 - Built Expressions - Online Construction Magazine - November 2014 Issue
        P. 43
     
       	                                                                                                         Cover Feature        This  includes  such  applications  as        compacting  the  fll  over  a  trench,        compacting  soil  around  a  footing,        or  working  in  areas  where  large        equipment  might  cause  damage  to        adjacent structures or property.           Manually  operated  compactors        come  in  a  number  of  different  styles        depending  on  the  application.  There        are small steel-wheel rollers, vibratory        plate compactors, and rammers. While        these  smaller  compactors  allow  the        Contractor  to  work  in  small  areas,        they  require  more  time  and  effort  to        compact  the  material  to  the  required        density. The use of full-size equipment        is generally preferred where possible.           Earth compactors-are designed for        diverse application in compacting soil,        sand  and  breaking  stone.  Therefore        these  earth  compactors  are  ideal        for  construction  purposes  and  road   tunnellingjournal.com        projects  since  these  works  require        compaction.  Earth  compactors  are        used  for  compaction  of  top  layer  of        earth.                                                                                    Tunnelling Equipment           Plate Compactors- are particularly        suitable   for   application   like    Tunnels of less than a meter or so in diameter are typically        compacting  loose  gravel  and  sand   done using trenchless construction methods or horizontal        on  footpaths,  sub-grade  for  concrete        foors,  trenches,  column  footings  &   directional drilling.        for  small  repair  works  like  pot-hole        repairs.        7. Grader Equipment                  is  embankments  &  providing  blanket   of less than a meter or so in diameter        A grader is also known as a road grader,   surface  before  spreading  ballast  and   are  typically  done  using  trenchless        a  blade,  a  maintainer  or  a  motor   laying  track.  Graders  are  also  used   construction  methods  or  horizontal        grader. This is a construction machine   to  set  native  soil  foundation  pads  to   directional   drilling.   Tunnelling        with a long blade used to create a fat   fnish  grade  prior  to  the  construction   equipment  has  limiting  disturbance        surface. Graders can produce inclined   of large buildings and for underground   to  the  surrounding  ground  and        surfaces,  to  give  cant  (camber)  to   mining. Capacities range from a blade   producing a smooth tunnel wall. This        roads.  In  some  countries  they  are   width of 2.50m to 7.30 m and engines   signifcantly reduces the cost of lining        used to produce drainage ditches with   from 93–373 kW (125–500 hp).      the  tunnel  and  makes  them  suitable        shallow  V-shaped  cross-sections  on                                     to use in heavy urbanized areas. The        either  side  of  highways.  Graders  are  8. Tunnelling Equipment        major  disadvantage  is  the  upfront        commonly  used  in  the  construction   Tunnelling  equipment  is  a  machine   cost. TBMs are expensive to construct        and  maintenance  of  dirt  roads  and   used to excavate tunnels with a circular   and  can  be  diffcult  to  transport.        gravel  roads.  In  the  construction  of   cross section through a variety of soil   However, as modern tunnels become        paved roads they are used to prepare   and rock strata. There can bore through   longer,  the  cost  of  tunnel  boring        the  base  course  to  create  a  wide  fat   hard  rock,  sand  and  almost  anything   machines  versus  drill  and  blast  is        surface  for  the  asphalt  to  be  placed   in  between.  Tunnel  diameters  can   actually less-this is because tunnelling        on.  Similarly,  graders  are  used  for   range from a meter (done with micro-  with TBMs is much more effcient and        levelling the surface during earthwork   TBMs)  to  almost  16  meters.  Tunnels   results  in  a  shorter  project  period.         Vol: 3  Issue: 11  November 2014                                                        Built Expressions     PG 43
       
       
     
