       	          Cover Feature         The operation during the foating pass should be slow and         uniform. This is then followed by the second pass to remove         any marks due to disc movement.         Skilled  and  trained  operators  are  blades  or  foating  disc  at  the  time  of         needed to operate these machines.   Floating,  which  is  the  frst  pass.  The                                             operation  during  the  foating  pass         12. Power Floats                    should be slow and uniform. This is then         A  power  trowel,  also  known  as  a  followed by the second pass to remove         ‘power  foat’,  ‘helicopter’  or  ‘trowel  any  marks  due  to  disc  movement.         machine’, is used to obtain a smooth,  Once  the  surface  has  been  'foated',         uniform, fat surface doing away with  the blades of the trowel are changed to         manual  inaccuracies.  Power  trowels  fnishing blades. The fnish pass should  Pile Driving Equipment         can  be  generally  classifed  based  on  be started when the surface has dried         the way they are controlled.        off, and walking on the surface leaves         •  Ride-on power trowels are operated  no appreciable indentations.           by  an  operator  seated  on  the    For the fnishing pass the blades are  come in a variety of shapes and sizes.           machinery  and  controlling  power  angled to suit the concrete, increasing  They  can  be  driven  into  the  ground           trowel movement.                  the angle after each pass - an angle of  vertically or at an angle. The material,         •  Walk-behind power trowels are used  around 5-10º is usual, the steeper the  size,  and  angle  of  the  piles  used  on           by  an  operator  walking  behind  the  angle  the  harder  the  fnish.  Several  a  Project  are  determined  during  the           machine.                          passes  with  the  fnish  blades  may  be  design  phase.  These  characteristics            It  is  mandatory  to  level  and  required to achieve the specifed fnish.  will  impact  the  type  of  pile  driving         compact  the  concrete  surface  prior                                   equipment that the Contractor uses.         to the use of Power Trowel. It is also  13. Pile Driving Equipment          The  ground  material  the  piles  are         essential to trowel at the correct time.  A  pile  is  a  structural  member  that  driven into also impacts the choice of         The operator must wait until the soft  is  driven  into  the  ground  to  provide  pile  driving  equipment.  Piles  can  be         concrete  hardens  suffciently  to  take  support for a structure. Piles are made  driven  through  gravel,  sand,  or  fne-         the  weight  of  the  machine  and  the  from  timber,  concrete,  or  steel,  and  grained soils with a range of moisture         operator.                                                                contents.  During  driving,  friction  will            The trowel is ftted with either foat                                  build up between the ground material                                                                                  and  the  pile.  The  amount  of  friction                                                                                  expected,  as  well  as  the  material                                                                                  present, will play a role in determining                                                                                  the best type of pile driving equipment.                                                        Power Float                  A  kind  of  ground  treatment  for                                                                                  strengthening  the  ground  soil  and                                                                                  makes it capable of supporting the load                                                                                  of building is called piling. It involves       img.directindustry.com                                            concreteconstruction.net  the  ground  level.  Generally,  concrete                                                                                  the  driving  of  pile  into  ground  below                                                                                  piles,  timber  piles,  steel  piles  and                                                                                  bored  piles  are  used  to  make  the  soil                                                                                  stronger  for  holding  the  weight  of  a                                                                                  building. On the other hand, sheet piles                                                                                  act as supporting wall due to ability of                                                                                  sustaining  the  lateral  load.  Specially                                                                                  designed piling equipment can be used                                                                                  for driving piles into the ground.                        Bar Bending Machines           PG 54    Built Expressions                                                          Vol: 3  Issue: 11  November  2014
       
       
     